Wednesday, 1 June 2016

Project Proposal

The Sampoerna University
“NEXT
(Nacre Earmarked Xtra-ordinary Tracker)”


Proposal of RP 55-1







Sampoerna University
Jakarta








I.            Background
Water is one of the crucial source of life for animals, plantations, and especially human. People use water in every aspect of life such as usage in daily life for drinking, cleaning, and agriculture. The existence of water is extremely important in order to maintain human life cycle. Previously, the river as a source of irrigation that transported high amount of water. Then, dense forest prevented soil erosion. As a result, there were no causes of water erosion and afterwards prevent river swallowing. Water sources were easily found rather than today. Moreover, water availability quite different among places. On top of that, many high lands’ water reservoirs are located far down the valley. As a result, many people work harder in order to transfer the water uphill by bringing the water with their buckets. There are some people who have more money, in this case people with more income transfer the water uphill using the electric water pump and diesel-fuelled water pump. In connection with energy crisis, automatically affects the price of fuel and probably it also affects the cost of electricity. As the cost of energy increases, it will make people especially farmers difficult to get energy for their daily life and agriculture, because of high cost of energy. In order to solve those problems, the concept of hydraulic ram pump is applied because of its sustainability and eco-friendliness to transfer the water uphill.
II.                Objective
According to the background above, the objective of this project:
1.      Ease people to transfer the water from lower altitude to higher altitude efficiently to fulfil their water demands.
2.      Apply the use of eco-friendly and sustainable pump.
3.      Build prototype that can be used for campus activities especially laboratory activities.

III.             Expected Result
The project is a form of Science and engineering application aimed to help society in order to get water from the remote water sources by using ram pump without electricity or any fuel-generated pump. Consequently, the project makes water transfer become eco-friendly and sustainable.


IV.             Activity
The project will be conducted in Malang with a notion to fulfill society needs who are working on plantation and agriculture, but it located away from water reservoir. These are the following step-by-step program:
1.      Brainstorming
This is the first step, all of the project members identify the problem related to water, irrigation as well as Ram Pump itself. Afterwards, it continued by looking up several journals and ended by solving problem in forum and finally the project members finalize idea.
2.      Discussion (meeting 1-4)
3.      Project proposal arranging
4.      Presentation
Presentation will be conducted to present and report the planned project in order to get feedback and suggestion from the supervisor for improvement.
5.      Prototyping
Prototyping will be conducted to produce small scale of the final product of ram pump. This step started after the concept is fixed.
6.      Evaluation
7.      Location Survey
The next step is location survey in order to decide the exact place to implement the final product. This step is initialized by presenting the final prototype of ram pump to the local people.
8.      Engagement
9.      Project Execution
The final step is the real implementation of project. The final product of ram pump is built according to the situation and condition of target place.





V.                Participants and Facilitator
Facilitator: Mr. Martinus D. Kurnia Dewa, M.Sc
The participants will be the society in the remote area which have mountain farming area.
VI.             Time
The tools will targeted finish in between July and August 2016. Then will be implemented in the following week.
VII.           Budget

Air Chamber Parts Schedule 40 PVC



no
item
quantity
price (Rp.)
total (Rp.)
1
HARVEL pipe 4" 10 ft  schedule 40
1
793.800
739.800
2
Mueller Industries PVC cap 4"
1
41.307
41.307
3
3/4" Sch 40 PVC Spigot Female Adapter - Spig x Fipt 478-007
1
3.528
3.528
4
12” Wheel Barrow Inner Tube.
1
145.383
145.383



TOTAL
930.018






Pump Body Parts Galvanized



no
item
quantity
price (Rp.)
total (Rp.)
1
MEC #ME412, Propane T-adaptor for campers, 1-15/16 inch female
2
587.265
1.174.530
2
DURA 2" schedule 40 PVC street elbow
1
36.750
36.750
3
DURA 1" schedule 40 PVC street elbow
1
11.025
11.025
4
NIBCO 2" x 1" PVC DWV flush bushing
1
29.106
29.106
5
Charlotte Pipe 2" x 3/4" PVC reducer bushing
1
34.986
34.986
6
LDR industries 2" close black steel nipple
1
47.187
47.187
7
Meueller Global 2" x 1/2" galvanized steel nipple
1
23.226
23.226
8
Mueller Global 585-001HN 1" close black nipple
1
25.137
25.137
9
Mueller Global 3/4" close black nipple
1
23.079
23.079
10
Mueller Streamline 1"  PVC check valve
2
115.689
231.378

The Homeworks Worldwide 2" PVC in-line Check Valve
1
214.914
214.914



TOTAL
1.851.318






Impetus / Waste Valve Conversion Parts



no
item
quantity
price (Rp.)
total (Rp.)
1
The Hillman Group 1/4-20" Stainless Coupling Nut
1
264.306
264.306
2
Crown Bolt 1/4" x 1-1/2" Stainless steel hex bolt
tba
 141.414/each
141.414
3
Everbilt stainless steel nut and washer kit
1 package
126.420
126.420
4
DANCO faucet washers assortment
tba
92.169
92.169



TOTAL
624.309






Construction Material



no
item
quantity
price (Rp.)
total (Rp.)
1
Bondo Home Solutions 0.74 fl. Oz. Fiberglass resin liquid hardener
1
84.819
84.819
2
Price Pfitser S49-360 lavatory kitchen hydroseal cartridge washer 4 pack
1
47.628
47.628
3
LDR Industries 1/2" x 24" black steel 40 cut
1
101.283
101.283
4
3M 9" x 11" 100 grit alumunium oxide sand paper
5 sheets-pack
49.539
49.539
5
Oatey 8 oz PVC handy pack Purple primer and solvent
1
123.333
123.333
6
Quick Color 10 oz flat black general purpose aerosol
1
14.259
14.259
7
Datey  1/2" x 260" PTFE thread seal tape
1
43.659
43.659



TOTAL
464.520






Accomodation



no
item
quantity
price (Rp.)
total (Rp.)
1
Transportation fee (to workshop in Bogor on making the prototype)
8 people
50.000
400.000



TOTAL
400.000










no
item
price(Rp.)


1
Air Chamber Parts Schedule 40 PVC
930.018


2
Pump Body Parts Galvanized
1.851.318


3
Impetus / Waste Valve Conversion Parts
624.309


4
Construction Material
464.520


5
Accomodation
400.000



TOTAL BUDGET
4.270.165






VIII.       Committee
The person who will in charge in this program are coming from Student of Faculty of Science and Technology Sampoerna University.
Facilitator                     : Mr. Martinus D. Kurnia Dewa, M.Sc
Project Officer             : Deas Pratama (201436000x)
Project Executors         : 1. Satria Robi Trisnanto (2014310002)
2. Agung Yudistira (2014310004)
3. Intan Ayu Larasati (2104310005)
4. Deas Pratama (201431000x)
5. Lutfi Hidayat (2014360006)
6. Anata Pratiwi (2014360007)
7. Luh Putu Eka Yani (2014370004)
Finance                                    : Anata Pratiwi (2014360007)



Proposed by,

President of Engineering Student Association,                                  Project Officer,



Lutfi Hidayat                                                                                     Deas Pratama
ID: 2014360006                                                                                  ID: 2014360004


Acknowledged by,

President Student Union                                                                    Facilitator,
Faculty of Science and Technology,



Ade Istianto                                                                           Mr. Martinus D. Kurnia Dewa, M.Sc
ID: 2014990003                                                                                        Advisor                                           


                                                           
Approved,


                                                           

Dr. Yoda R. Patta, Ph. D.
Dean of Faculty of Science and Technology
Sampoerna University


0 comments:

Post a Comment

Contact

Talk to us

Lorem ipsum dolor sit amet, consectetur adipisicing elit. Dolores iusto fugit esse soluta quae debitis quibusdam harum voluptatem, maxime, aliquam sequi. Tempora ipsum magni unde velit corporis fuga, necessitatibus blanditiis.

Address:

9983 City name, Street name, 232 Apartment C

Work Time:

Monday - Friday from 9am to 5pm

Phone:

595 12 34 567